Your Position: Home > News

Grouting Plant
Grout Mixer and Agitator
Grout Pump
HydroSeeders
Refractory Gunite/Mixer
Shotcrete Machine
Industrial Peristaltic Pump
Foam Concrete Machine
Concrete Mixer
Concrete Pump
Plaster Machine
hydraulic pump station
Customized Service

Phone/Wechat

+86-18538591025

Whatsapp

+86-18538591025

Email

sales@leadcrete.com

skype:

machine.machine6

ADDRESS

Xisihuan Ring-Road East, Tielu, Xiliu Lake sub-district, Zhongyuan District, Zhengzhou, Henan China

Use of Foamed Concrete for Trench Reinstatement

2018-06-21 10:16:33

In 1991 new laws were introduced by the British Parliament which included new specifications for the reinstatement of openings in highways. It was recognized that the poor state of many British roads was a result of poor road reinstatement.

There were two main reasons for reinstatement failure:

(i)  Use of unsuitable backfill materials, due to composition or incorrect water content.

(ii)  Inadequate compaction of backfill, as existing methods do not give full compaction or restore full lateral support to the trench walls.

Traditionally excavations were filled using granular materials, usually crushed stone. The major problem with such materials is compaction. Not only is it impossible to achieve full compaction during reinstatement, but problems occur at the edges of trenches where the compactor will not fit. It is also impossible to compact around other services without causing damage. After surfacing, settlement of the backfill material occurs due to trafficking, only reaching full compaction after six months, when the road surface has to be re-excavated, and a new surface laid.

In 1991, the New Roads and Street Works Act was passed, which laid down new specifications for the reinstatement of openings in highways, and also included a specification for the use of foamed concrete as a backfill material.

The new specifications demanded that the backfill materials fulfill the following criteria:

(i)  The fill material should require little or no compaction, and should not settle after placing.

(ii)  It should not transmit axle loadings directly to the service in the trench.

(iii) Final resurfacing should be possible almost immediately, and there should be no need to revisit the site to replace the surface at a later date.

(iv) The technique should be economic.

(v) The material should be readily available.

(vi) The material should permit easy re-excavation.

(vii) The technique should be easy to perform.

(viii) The material should be suitable for filling narrow trenches.

Since foamed concrete fulfills all of these criteria, it is a very suitable material for trench reinstatement, and has been successfully used for this purpose by several utilities companies in the UK. And now foam concrete has become the most popular material for trench reinstatement all over the world.

We are one of leading manufacturer of foam concrete machine in China, and can supply many models with different capacity and application. Any information you need, please leave message to us.